Power Station
Public Building

 
CASE STUDY
Power Station
Beijing Taiyanggong Gas Power Station
BlueScope NECTERE GOLDLINK™ and LYSAGHT TRIMDEK® were applied as walling systems, which is featured by evenly positioned extruding decorative columns that were made from pre-curved ...
Guangxi Fangchenggang Thermal Power Station Phase I (2X600MW)
LYSAGHT TRIMDEK® and purlin and girt systems were applied as walling systems in the main power hall, with total area of 8,000 square meters. ..
Shanghai Waigaoqiao Thermal Power Station Phase III Main Power Hall (2x1000MW)
Projection area of roofing is 7,220 square meters; eave height is 38 meters, and the roof pitch is 8%, single slope length is 34 meters
Chongqing Luohuang Thermal Power Station Phase III (2×600MW)
This project requires Lysaght technical and design team to provide a complete steel cladding solution to all the concrete and curved steel rack structure
 
BuleScope Steel Websites
BlueScope Steel Suzhou >>
BlueScope Butler >>
BlueScope Lysaght >>
BlueScope Nectere >>
BlueScope Residential >>
BlueScope Vistawall >>
 
   
Career
Contact Us
Enquiry