LYSAGHT® Structural Decking is roll-formed from hot dipped, zinc-coated, high strength grade steel strip. It is the production of BlueScope Buildings that after many years' intensively researching the behavior of profiled steel sheet acting as longitudinal reinforcement in composite beams and slabs. It is widely used for concrete slab construction and suitable for concrete, masonry or steel frame building construction.
All the load tables and data of LYSAGHT® Structural Decking have been prepared using actual test data to ensure maximum performance and quality. We conducted LYSAGHT® Structural Decking system tests in China, USA and Australian testing centers, including:
Fire rating test
Slip Block Test
Formwork Test
Full scale slab Test
Advanced composite floor system:
Lysaght structural decking performs as positive reinforcement as well as permanent formwork, thus providing savings in concrete and reinforcing steel.
Excellent fire rating performance:
Lysaght structural decking system had passed the fire rating test at the China Quality Supervision and Test Centre for fixed fire extinguishing systems and fire resisting building components. It also passed the fire rating test without sprayed fire treatments to the underside of the steel deck when designed as composite slab.
Quick and simple installation:
Coupled with nil or less propping compared to strippable formwork, Lysaght structural decking is quick and simple to install, providing safety and neat platform for construction and saving considerable construction time which translates to savings in overall construction costs.
Features of W-DEK® are:
The patent embossments, rolled into the profile create a high bond between concrete and the deck together with the smaller ribs and flutes enhance our product¡¯s composite action and rigidity;
LYSAGHT W-DEK® design as composite slab provide more cost effective solution, saving in the concrete and reinforcing steel and also reduce the self weight of buildings;
LYSAGHT W-DEK® passed American UL fire rating certification and ICBO requirements. It¡¯s fire rating performance over 1.5 hours without sprayed fire treatments.
Shenzhen Nanshan Power Station Location: Guangdong Shenzhen Area: 56,068m2 Sign Time: 2002/2003 LYSAGHT® System: LYSAGHT W-DEK®
LYSAGHT TRIMDEK®
LYSAGHT PRESTIGE PANEL®
LYSAGHT® Structural Purlin and Girt System Type£ºIncinerator
Designed by North China Power Engineering CO,LTD
Shenzhen Nanshan Power Station
Global Financial Center Location: Shanghai Area: 211,562m2 Sign Time: 2005 LYSAGHT® System: LYSAGHT W-DEK® Honours: Shanghai Steel Structure Jingang Special Award